Description: 10000W 220V Hydroelectric Power Turbine Hydropower Generator Water Pelton Wheel Hydro Generator 5000W Water Turbine Impulse Generator Pelton Wheel Power: 10000W Single phase: 220v Flow: 0.035m3/s Water head: 10-30m Speed: 500-1500 rpm Current: 21.8A Weight:68KG Water pipe joint :90mm Dual-use hydroelectric, can impact water when the water generator to generate electricity, diesel or gasoline engine can be used to drive power if there is insufficient water supply. Designed for the manufacture of the seasonal depletion of regional water resources. Our professional and technical personnel to learn advanced experience, well-developed, according to remote areas, without the characteristics of different water conditions and electrical areas, local conditions to design a variety of sizes and types of permanent hydro products, is mountainous areas over the power supply apparatus lighting, audio, television, fans, and home appliance electricity. Products with small size, light weight, easy to install, reliable, high economic efficiency, durability and other characteristics. Selling the price of the product and not representing the level of product quality is good or bad, it also depends on the profit point the treasurer heart is. We mainly to the wholesale shop entity combining multiple sales channels, every day goods sent to the country so a lot of selling on price, so that some businesses the sales price to the customer than we actually price is even higher, please have the intention to buy customers to seriously consider selecting micro hydro plant is the right product only one aspect, purchase products on Taobao, your most important thing is to see how after-sales service. Factory direct is your good choice! Standalone detailed parameters Precautions: 1. Non-load power, if you do not need an electricity generator set valve switch is closed, stopping the impeller turn red generator, hydro prevents burning load. 2. Any power generator's real issue is the amount of eighty percent mark, real hair 1000W power is 800W, electrical starting power double refrigerator if you are 150W, 300W of power when you need to start. 3. electrical household appliances in principle, start big power, then start small power, super power can not run. Do not no-load operation Installation and operation instructions 1. Installation requirements: the bottom plane of the hydraulic turbine is closely contacted with the foundation plane without gaps, and the contact surface neither makes the tail water splash nor leaks outward. 2. Installation procedure: After the unit foundation with concrete is solidified, the unit shall be installed in place and then poured in sequence. When installing the unit, the levelness must be measured with a level ruler to ensure that the unit is fixed in a horizontal position. The gap between the unit and the ground shall be sealed with cement to prevent water seepage. After the installation of the unit, another inspection shall be carried out, and the runner shaft of the hydraulic turbine shall be rotated manually. If it moves flexibly, the installation of the unit shall be completed. 3. Basic requirements for pipe installation: pipes shall be purchased according to the pipe diameter required by the unit, and the drop height can reduce the pipe diameter. The pipeline shall be straight and the bending shall be minimized. The included angle between the pipeline and the horizontal shall not be less than 25 degrees. Otherwise, the pipeline will grow and the head loss will be large, which will lead to insufficient power generation and other consequences. The water inlet of the headrace pipe installed in the forebay wall is most likely to be a flared pipe. Its lower edge is not less than 0.2 meters from the pool bottom plane. The inner diameter of the joint shall be equal. In order to reduce the head loss, the joint shall be minimized. 4. Installation of steel pipes: most of the micro hydropower stations use steel pipes with flanges welded. During installation, the flange rubber pad must be placed correctly to avoid reducing the water passing section. The pipe joint nuts should be tightened gradually in diagonal order. 5. Anchor block: at the water diversion pipe joint and turbine nozzle, the pipe bears the maximum pressure, so a anchor block must be built with stone or concrete to fix the metal pipe. 6. Buttress: due to the weight of self weight and water, the metal pipe is easy to bend and deform if it is too long, so a buttress must be added in the middle. The location of the branch pipe should preferably be set at the joint of the pipe. Inspection after installation 1. Check the pipes and joints for leakage. If leakage is found, the causes shall be analyzed and handled in a timely manner. 2. The dirt blocking the pipeline left during installation shall be cleaned to ensure smooth water flow. 3. Check whether the pipe is bent or deformed and whether the support is firm after bearing the water pressure. In case of any abnormal phenomenon, it shall be handled in time. Installation of valves The valve is installed on the water intake pipe, and the end close to the unit is about 1 m away from the nozzle or directly installed on the nozzle, depending on the specific situation. The valve diameter of micro hydropower should be consistent with that of water pipe. Gate valve or ball valve can be selected, but stop valve must not be used, because the selection of stop valve will reduce the flow section and affect the turbine output. Two points must be paid attention to when installing the valve: 1. The centerline of turbine runner shaft and tailrace must be kept on the same plumb line. 2. The flange rubber gasket shall be properly padded and the bolt connection shall be fastened, so as to reduce the head loss and prevent leakage. computer room The machine room of the micro turbine unit can be built as a civil building, which shall ensure ventilation in the room and be free from water leakage and seepage. Its area depends on the size of the unit, and the distance from the unit to the wall shall not be less than 0.8m to facilitate installation, maintenance and operation. debugging Inspection before commissioning. After the installation of micro hydropower, it must be checked before the test run. The inspection includes the inspection of installation quality, micro water motor unit and electrical system. Inspection of installation quality 1. The water channel and headrace pipe shall be free of water leakage, the fence at the water inlet shall be free of debris, and the valve shall be flexible to open and close; 2. The water level of the ponding pond shall be kept to the design water level; 3. The drainage ditch shall be covered tightly; Inspection of micro water motor unit and electrical system 1. Open the control box cover of the generator and check whether the brush and slip ring are in good contact; 2. All mechanical connection fasteners shall be free from looseness; 3. The runner shall rotate flexibly without shaking or abnormal sound, and lubricating oil shall be added to all rotating parts. 4. The wiring of electrical appliances shall be reliable, and the total power load shall not exceed the rated generating power of the generator set. Units connected with electric regulators or equipped with mechanical voltage regulators may not be connected to the load temporarily, but the electric regulators must be firmly wired or the mechanical voltage regulators must be sensitive. Commissioning Slowly open the gate to drain water, the water flow will drive the runner to rotate, and the generator voltage will slowly rise to the rated voltage. Note: (Users who install valves must open the valve to the maximum position) If the maximum generating capacity exceeds 20% of the rated generating capacity of the unit, the water volume should be reduced and the maximum generating capacity should be adjusted to 105% of the rated generating capacity to prevent the unit from working under overload for a long time. If the generating capacity is less than the design capacity, check whether the submergence depth of the headrace of the forebay is sufficient, whether there are cyclones entering, whether the headrace is blocked, and whether the unit operates with jamming and friction, and try again after the problem is eliminated. parking Remove the load at each power end, open the switch, and then close the gate. The permanent magnet motor shall first close the water gate of the turbine and then open the electric switch Payment Lieferdetails Rückholservice About us Contact us Payment 1.You can place an order and pay directly through eBay. After we receive your payment, we will prioritize your order. 2.Payment is required to get within 7 days after deal. If not, we will close the transaction. 3.If you have any problems after purchase, please contact us directly through eBay, and we will do our best to help you solve the problem. Lieferdetails Standard delivery time: We can bear all customs, we ship the goods via Sea shipping transportation channels and pay all customs in advance, so customs will release it directly when the package arrives in your country without charging you any fees, but the transit time will take 4-5 weeks or so. I hope you can be patient Accelerated service: If you need this product urgently, please contact us directly, we can speed up the transportation by air for you. However, you will have to pay additional accelerated fees, and when the package arrives in your country, there will be customs fees that you will have to pay yourself. Country Shipping service Tracking NO. shipping time USA Sea shipping No(Follow-up Tracking information will not be generated until the package arrives at the destination country) 20-35 work days Express shipping Yes 7-10 work days Canada Sea shipping No(Follow-up Tracking information will not be generated until the package arrives at the destination country) 35-50 work days Express shipping Yes 7-10 work days Australia Sea shipping No(Follow-up Tracking information will not be generated until the package arrives at the destination country) 35-45 work days Express shipping Yes 7-10 work days United Kindom Sea shipping No(Follow-up Tracking information will not be generated until the package arrives at the destination country) 35-50 work days Express shipping Yes 7-10 work days Italy,France,Germany, European rail transport No(Follow-up Tracking information will not be generated until the package arrives at the destination country) 45-50 work days Express shipping Yes 7-10 work days EU coutries EU Royalway No(Follow-up Tracking information will not be generated until the package arrives at the destination country) 45-60 work days Yes 7-10 work days Note: Our products are shipped by sea or European rail as standard. We'll help you pay customs. If you need it urgently, let us know, we can help you ship it through accelerated service, but there is an additional accelerated fee, and when the package arrives in your country, you will have to pay the duties yourself. Rückholservice 100% guarantees of quality and service If you are not completely satisfied with your product, please let us know within 30 days of receiving the product and you can also send us an email message. We will take care of the problem of return and exchange for you the first time. I'm sorry. I'm sorry. 1.Note: For your best shopping experience in our store and save time. Please do not click on "Return this item", except that you simply do not need it anymore. Since "Return Request" cannot help you solve the problem efficiently, it may take a little longer for you to get a response as we check every two days with our "Return Request". This is the fastest way to solve any problem for you (we may reply a day later if you contact us on Saturday). You will receive helpful and practical solutions through the communication between us. 2.If you need a return shipment, please double check if the item does not work, and contact our customer service representative, tell us the detailed problem and send us some pictures for confirmation. Then you will receive a unique address for the return. About us Welcome to our eBay shop.As a leading and emerging company in manufacturing and export business, Bayoung has specialized in business and industrial products, home and garden products for more than ten years.We believe that our vision and mission is to provide innovative products with best service and competitive price, Our goal is to make sure you find exactly what you are looking for and to make it easier for you to place your orders. Contact us Welcome to our shop! Your satisfaction is our top priority. Please do not hesitate to contact us if you have any questions about our products or services. Thank you very much! Our working hours (Monday to Friday): -09:00-12:00 (GMT+8) -14:00-18:00 (GMT+8) Saturday: -09:00-12:00 (GMT+8) -14:00-17:00 (GMT+8) All emails are answered very quickly during our working hours, emails are usually answered during the holiday within 24-hours. Welcome to contact us if you have any problem.
Price: 2500.39 USD
Location: Yiwu
End Time: 2024-11-12T12:20:28.000Z
Shipping Cost: 0 USD
Product Images
Item Specifics
Restocking Fee: No
Return shipping will be paid by: Buyer
All returns accepted: Returns Accepted
Item must be returned within: 30 Days
Refund will be given as: Money back or replacement (buyer's choice)
Current Output: 20-29 A
System Configuration: Hybrid
Solar Technology: Do Not Apply
Power Source: Water
Wattage: 5000-5999 W
MPN: Do Not Apply
Current Type: AC
Voltage: 201-300 V
Axis Orientation: Horizontal
Features: All Daylight Conditions, Automatic Voltage Detection, Bluetooth Module, Brushless Motor, Corrosion Resistant, Daylight Operation, Fixed Guyed, Flexible, Foldable, Freestanding
Pliability: Rigid
Maximum Input Power: 5000W
Maximum Input Voltage: Greater Than 200 V
Color: Green
Current Rating: 21-30 A
Material: Stainless Steel
Brand: Bayoung
Type: Pelton Turbine
Model: Bayoung-CJS-5KW
Recommended Environment: Outdoor
Resistance Properties: Abrasion Resistant, Acid Resistant, Antimicrobial Resistant, Chemical Resistant, Childproof, Child Resistant, Corrosion Resistant, Dustproof, Dust Resistant, Fade Resistant
Charging Mode: MPPT (Maximum Power Point Tracking)
Country/Region of Manufacture: China
Application: Agriculture/Farming, Aquaculture, Back-up Power, Camping/Hiking, Irrigation, Municipal, Pool, Shed
Power: 5000W
Maximum Water Head: 30m