Eppendorf

3VINTAGE SCRIPTO Extra Strong Drawing Writing Long Leads Made in the USA Yellow

Description: This vintage Scripto pencil refill set is perfect for all your drawing and writing needs. Made in the USA, these extra strong leads are designed to withstand the test of time and provide a smooth writing experience. The yellow color adds a touch of vintage charm to your collection. The set includes extra strong drawing leads in an unspecified diameter, suitable for use in mechanical pencils. The brand is Scripto. This item is a great addition to any collection and is perfect for anyone looking for a touch of vintage charm in their writing instruments. This item contains 3 full boxes as shown in picture. A are Yellow in color. Thanks!

Price: 49.99 USD

Location: Lebanon, Ohio

End Time: 2024-12-03T18:30:03.000Z

Shipping Cost: N/A USD

Product Images

3VINTAGE SCRIPTO Extra Strong Drawing Writing Long Leads Made in the USA Yellow 3VINTAGE SCRIPTO Extra Strong Drawing Writing Long Leads Made in the USA Yellow 3VINTAGE SCRIPTO Extra Strong Drawing Writing Long Leads Made in the USA Yellow 3VINTAGE SCRIPTO Extra Strong Drawing Writing Long Leads Made in the USA Yellow

Item Specifics

All returns accepted: ReturnsNotAccepted

Brand: scripto

Type: extra strong drawing leads refill

Lead Diameter: Unspecified

Material: Paper & Wood

Country/Region of Manufacture: United States

Modified Item: No

Vintage: Yes

Recommended

Scripto Thinline Mechanical Pencil P400 Box Of 12 (Black) NOS U.S. Government
Scripto Thinline Mechanical Pencil P400 Box Of 12 (Black) NOS U.S. Government

$69.99

View Details
SCRIPTO VU - C J HUGHES CONSTRUCTION CO - ADVERTISING LIGHTER IN BOX - UNFIRED
SCRIPTO VU - C J HUGHES CONSTRUCTION CO - ADVERTISING LIGHTER IN BOX - UNFIRED

$29.00

View Details
VINTAGE MECHANICAL PENCIL NO. 1 SIZE SCRIPTO ERASERS & PENTEL REFILL ERASER
VINTAGE MECHANICAL PENCIL NO. 1 SIZE SCRIPTO ERASERS & PENTEL REFILL ERASER

$49.99

View Details
14 Mechanical Pencil Lot w/ Kokuyo Itoya Pentech Pentel Papermate Berol Scripto
14 Mechanical Pencil Lot w/ Kokuyo Itoya Pentech Pentel Papermate Berol Scripto

$16.89

View Details
Vintage CASTELL Mechanical Pencil Leads BLACK No. 4442 HB MED Stand 046" 12 Pcs
Vintage CASTELL Mechanical Pencil Leads BLACK No. 4442 HB MED Stand 046" 12 Pcs

$30.00

View Details
Mid Century Modern Vintage Scripto Lucite & Chrome Table Lighter
Mid Century Modern Vintage Scripto Lucite & Chrome Table Lighter

$14.00

View Details
SCRIPTO P21 Mechanical Pencil 0.7mm Black Rubber Grip Taiwan Tested Retired
SCRIPTO P21 Mechanical Pencil 0.7mm Black Rubber Grip Taiwan Tested Retired

$19.99

View Details
Scripto Views Adjustable Lighters 4-Pack
Scripto Views Adjustable Lighters 4-Pack

$19.99

View Details
Vintage Scripto  Lead Black Barrel Pencil Pushpoint 0.5mm NO B1159C & Refills
Vintage Scripto Lead Black Barrel Pencil Pushpoint 0.5mm NO B1159C & Refills

$12.00

View Details
Vintage Scripto USA Fluid Vu-Lighter Jumping Fish Trout Red Band Pat 1959 GUC
Vintage Scripto USA Fluid Vu-Lighter Jumping Fish Trout Red Band Pat 1959 GUC

$12.50

View Details